Back to Projects

AIDP Ripley Sub-Acute Hospital & Multi-story Carpark

Inertia is currently providing Structural and Civil Engineering services for the Sub-Acute facility. Concept and Schematic design phases are complete, with the Design Development phase currently nearing completion. The facility contains 90 sub-acute beds in 3 x 30 wards. The building is a reinforced concrete structure interfacing with the existing single-level Satellite Hospital. Civil works include an on-grade carpark with 90 spaces.

Inertia is currently providing Structural and Civil Engineering services for the Multi-Story Carpark facility.  Concept and Schematic design phases are complete, with the Design Development phase currently nearing completion. The carpark footprint is approximately 60 metres x 30 metres, with two split-level suspended floors and a roof over. The suspended floors consist of a post-tensioned banded solution, with dual cantilever slabs.  This system provides an efficient balanced floor structure, which minimises the number of columns.  Screens are provided to building elevations. The structure for the screens doubles as a vehicle impact barrier.

CompletionMid 2025

DescriptionCivil & Structural Engineering

ClientDepartment of Health & Hutchinson Builders

CategoryHealth