Back to Projects

Calamvale Special School

Facing unique challenges to address overland stormwater flow, our Civil and Structural teams worked together to create a project solution that enabled the new General Learning Centre at Calamvale Special School to work with the existing profile of the land. This allowed the building construction programme to be brought forward; by negating the need for large underground stormwater infrastructure and extensive earthworks.

Architecturally designed by COBiE Group, the structural framing design of the building was developed to work efficiently with classroom layouts and enable flexibility for future remodelling or alternate layout configurations.

The outdoor play area, designed by Landscape Architect, Jeremy Ferrier, is entirely suspended over an under-croft with open channel flow for stormwater management, and topped with varying structural levels – including a ‘dry’ creek – to enrich the experience of play-centred learning.

Inertia and Paynters worked collaboratively through the construction phase to ensure a quality outcome, and we are proud to deliver this creative, functional, and adaptive facility for Calamvale Special School.

Key Features:

• Multi-storey learning centre
• Outdoor play area
• Carpark

Completion2024

DescriptionSpecial Education School

ClientPaynters

CategoryEducation