Action Metal Recyclers
Inertia prepared the civil and flood engineering documentation to obtain the development approval to convert this lot into a scrap metal yard. A tributary of the Kedron Brook conveys along the southern boundary, therefore flood modelling was an intricate part of the design process to ensure the new use did not cause adverse impacts to the receiving waterways.
Stormwater treatment measures in the form of the bioretention basins were incorporated to ensure site runoff does not cause detrimental impacts to the receiving waterways. The team at Inertia Engineering continued onto the detail design phases as well as the construction supervision of Action Metal Recyclers.
Completion2019
DescriptionCivil and Flood DA documentation
ClientAction Metal Recyclers
CategoryIndustrialWater